shipinhours.com

Scale without hiring

Scale development without hiring.

A large project needs capacity that a hiring plan cannot deliver in time. AIPOS OÜ runs a multi-agent system that builds, tests and documents production code in continuous 24/7 cycles, against an architecture designed in-house by AIPOS OÜ and agreed with you in writing. Capacity is measured in delivered scope, not in headcount.

No recruiting, no onboardingCapacity that runs 24/7Fixed price per scope

The situation

You cannot hire your way to a deadline.

When a project needs many developers at once, every route to them is slow and the output is not proportional to the number of people added.

Recruiting

Open roles do not ship features

Sourcing, interviewing, notice periods and onboarding all happen before the first commit. The deadline does not wait for the pipeline.

Coordination

More people, more coordination, less output per person

A larger team spends a growing share of its time keeping itself aligned. Adding developers late to a project rarely makes it earlier.

Commitment

Headcount for a peak becomes a permanent cost

Teams hired for one large project are still on payroll when the project ends. Contractors solve that at hourly rates with no responsibility for the result.

What you get, compared with the alternative

What you get Scale without hiring

Capacity measured in delivered scope

Instead of adding people, add a fixed-price delivery stream that runs around the clock, in parallel with your own team, delivered as tested packages.

  • A written scope description and fixed price for each stream of work
  • A trial build within 72 hours of written confirmation to measure the throughput on your own code
  • 24/7 build cycles with automatic continuation and a self-healing watchdog
  • Tests and an independent review agent before every merge
  • Tested code packages at every milestone, for your team to integrate alongside its own work
  • Full intellectual property to you; no headcount to unwind afterwards
Request a project
Compared with Hiring or renting developers

People and hours, paid before output

Hiring buys potential; renting buys hours. Both add coordination and both are paid whether or not the scope ships. A fixed-price stream is paid for a result, and all communication is in writing so it does not consume your team's meeting time.

  • Open roles do not ship features
  • Coordination cost grows with every hire
  • Paid whether or not the scope ships
  • Headcount to unwind when the peak is over

Instead of hiring developers: the full comparison

Hiring versus ordering

24/7 from sign-off

Your project starts. It never stops.

Capacity no hiring plan can match in time: from the moment the scope is signed off, an autonomous development system works on it 24/7 — no nights off, no weekends, no onboarding. Months of team output, delivered in days.

01

Starts within hours

Work begins within hours of your written scope sign-off. No recruiting, no onboarding, no waiting for a sprint to open.

02

Runs around the clock

Autonomous and continuous until delivery: no nights off, no weekends, no handovers, no pauses.

03

Progress you can see daily

Every change is tested and committed in AIPOS OÜ's own secure development environment. You receive a written progress report every day, and tested code of your product is delivered at agreed milestones — in full after final payment.

04

Architecture agreed first

The architecture and specification are designed in-house by AIPOS OÜ and agreed with you in writing before any code is written.

Choose this if you need serious development capacity fast, without hiring a team.

The process

Adding a delivery stream next to your team.

Your team keeps the parts of the project it wants. The streams you hand over are scoped in writing, built in isolation and delivered as tested packages.

01

Split out a scope

Describe the subsystem or module stream you want delivered, the technology and the deadline. You receive a written scope description.

02

Trial build, 72 hours

After written confirmation, a real piece of that stream is delivered within 72 hours: tested, documented, full IP. Fixed price 9,900 euros.

03

Fixed quote for the stream

Measure the throughput and the code quality on your own project. If you continue, the stream is quoted at one fixed price; the trial price is deducted in full.

04

Run in parallel

The system delivers in 24/7 cycles while your team works on the rest. A tested, reviewed package arrives at every milestone.

Trust & delivery standards

Your systems stay untouched. Your product arrives tested.

All development happens in AIPOS OÜ's own secure environment. We never connect to your code hosting, servers, cloud accounts or development environment, so no outside party enters your systems and your supplier and security risk stays small. You receive tested code as a clean package, not half-finished changes in your main branch, and you follow progress every day without watching any technical tools.

Code quality

How the code is built and handed over

  • Tests and independent review. Every change passes the automated test suite and an independent review agent before it is merged.
  • Documentation, tests, history. You receive the documentation, the tests and the complete git history of your product's code.
  • No dependency on our tools. Code and intellectual property transfer to you without any dependency on AIPOS OÜ's tooling: the product builds, tests and runs from the delivered package with publicly available tools.
  • 30 days of free fixes. Defects found within 30 days of hand-over are fixed free of charge, within the written scope description.
Project delivery

How you verify the work without seeing our environment

  • Specification first. A written specification with measurable acceptance criteria, prepared by AIPOS OÜ and confirmed by you before development starts.
  • A written report every day. By e-mail: what was done, which tests passed, where the work stands against the criteria, the next step, and whether anything needs your answer.
  • Preview at every milestone. A password-protected preview link where you try your product working, at every milestone.
  • Code you can audit. At every milestone, a test report and the product's code at that point as a file package: run it yourself or have an independent developer audit it. The complete code follows final payment.
  • Written acceptance. You accept in writing against the agreed criteria. 50% is paid on scope confirmation and 50% only after acceptance; then 30 days of free defect fixing within the written scope. All communication is by e-mail.

Company details, security, warranty, payment and VAT terms in one place: Trust & delivery standards. The binding wording is in the terms of service.

Prices

Two steps, both at a fixed price.

You see the price before any work starts. There is no hourly billing and no staff rental. The trial build is a real piece of your plan, and its price comes off the main project in full.

Step 1 · Trial build
€9,900fixed · excl. VAT

A real part of your development plan, delivered within 72 hours of your written scope confirmation as a preview link, a test report and a code package. Full intellectual property to you. 50% on sign-off, 50% after written acceptance; 30 days of free defect fixing. Deducted in full from the main project.

Founding clients
€4,900first three clients · excl. VAT

The first three clients receive the trial build for 4,900 euros in exchange for a public reference once the work is delivered.

Step 2 · Main project
Fixedquoted in writing · excl. VAT

The whole scope at one fixed price, delivered in days and weeks. Every change is tested and committed. Every project is built on a software architecture and technical specification designed in-house by AIPOS OÜ — reviewed and agreed with you in writing before development begins.

A good fit when

A large project with separable scopes

  • Modules or subsystems that can be specified and tested independently
  • A team that integrates delivered code through its normal review process
  • A deadline that a hiring plan cannot meet
  • Any stack; any country; remote only
Not a fit when

You need people embedded in your team

  • Staff augmentation, body leasing or renting developers
  • Hourly or time-and-materials billing
  • Small, isolated one-off tasks
  • Work that requires calls or meetings

Questions

Questions from teams that need more capacity.

How is this different from staff augmentation?

Staff augmentation adds people to your team, which you then manage, by the hour. We deliver a defined scope at a fixed price, in writing, with the architecture and specification designed in-house by AIPOS OÜ and agreed with you in writing. You manage a scope, not people.

Can it work alongside our in-house team on the same codebase?

Yes. Scopes and interfaces are separated in writing so the streams do not collide. You send a copy of the relevant code as a file package; the stream is built in AIPOS OÜ's own environment and returns to you as a tested package at every milestone, which your team reviews and integrates through its normal process.

How much capacity does the system add?

Twenty-four hours of its work equals four to eight weeks of a small software company, measured on AIPOS OÜ's own production systems. We do not publish other throughput figures; the trial build measures it on your own project within 72 hours.

What keeps the quality up at that speed?

Every change must pass the test suite and an independent review agent before it is merged. The architecture and specification are designed in-house by AIPOS OÜ and agreed with you in writing before any agent touches code, and every outgoing change is scanned.

Is there a minimum or maximum project size?

The minimum is the trial build: a real, bounded scope for 9,900 euros, deducted from the main project. Above that, the full scope is quoted at one fixed price. The service is built for large plans, not for small one-off tasks.

What happens when the project ends?

Nothing to unwind. There is no headcount, no contractors to release and no notice periods. The code, documentation and intellectual property have been delivered to you.

Hand over the stream your team cannot staff.

Describe the subsystem in the form. You receive a written scope description for a trial build, delivered within 72 hours of confirmation.